Case study · Best-Flow Drainage Solutions · Charlton, London
Six pieces of software down to one. Admin down from 22 hours a week to 2.
Best-Flow is a two-man drainage firm in south-east London: blockages, high-pressure jetting, CCTV surveys and remedial repairs, about 150 jobs a month. Its owner, Russell Bussey, is also its busiest engineer, and the paperwork was going on his day off.
“Being more organized to free up my brain.”
Before
One job, six places.
With one full-time engineer and about 150 jobs a month, a single job passed through six different tools. Joining them up was done by hand, mostly by Russell.
After
One system, built round how Best-Flow works.
All six were replaced by one SysteMate system, set up in Best-Flow’s own words: its job types, its report layout, its way of filing a customer.
Why it worked
It was built round his week, not the other way round.
Nothing here is a drainage product. The words, the stages, the report and the way an address is filed all came from a two-hour conversation about how Best-Flow actually works — and they would be different for you.
That is the whole idea: one system for one business, built from parts we have already made, so the time goes on the part that is genuinely yours.
How it works
Three steps, and the first one is a conversation.
Nothing to pay up front, and no licence to buy when you take someone on — we price by the size of your team, in bands, not per seat.